It’s hard to believe that it’s been a year since we first started working on the “Garbage Garage” , a new garage constructed using rammed-earth tires and salvaged glass bottles. (see our post from June 2009)

Last month, the painters completed their work. It is done!

DSC_0098

DSC_0104

In this blog, I’ll discuss our design process and preparing for construction. Next month’s blog will be focused on the construction process.

Recap

The genesis of this project was my client, Elizabeth Rose, who is president of Long Way Home, a community-based, nonprofit organization in Guatemala that is building homes and schools using these construction methods.  In Guatemala, these construction types are a perfect solution for very poor residents who need shelter and community buildings.  In addition to the benefits noted above, building with tires, cans and bottles is cheap; the materials are virtually free, labor costs are low, and the building techniques are easily taught to otherwise unskilled laborers.

Elizabeth saw her family’s need for a garage as an opportunity to showcase alternative environmentally sustainable building practices and to help potential supporters understand the important work that Long Way Home is doing.

We are grateful to our amazing clients (Elizabeth and her husband Joe)  for the opportunity to be involved in such an interesting and important project.  We appreciate their tenacity in getting the project done and their amazing outlook even during the biggest challenges we encountered.

Construction Documentation and Planning for Construction

The project was quite a journey…we worked hard with Joe Fix, our structural engineer, on proper detailing for the project. The wall details and construction became a hybrid of the methods used by Long Way Home in Guatemala and methods traditional for this area and required for permit approval. Ericka Temple, who is part of Long Way Home, assisted with the construction drawings and was also part of the construction crew. The final design included a massive concrete foundation with steel reinforcing bars anchoring the foundation to the tire walls. Here is one of the wall details:

 rose_wall secs copy

Placing the garage on the site was another challenge. Construction of the garage would be near a beautiful cherry tree and we needed to avoid harming it during construction. We also wanted the placement to ensure that the garage was not seen first while approaching on the drive. Matt Ulrich from UBLA provided the site design work for what proved to be a perfect location for the new garage.

DSC_0109 (16)

We had some touch and go with the moving the project forward. Our first hurdle was finding a contractor comfortable working with the rammed-tire process. Our clients planned to bring a Long Way Home crew from Guatemala to complete the tire portion of the project, but contractors were still squeamish and bid the project (high) accordingly. We even had one low point in the project when our client requested that for cost reasons, we revise the drawings for conventional construction. The project lost all momentum until Elizabeth said, “Wait! What are we doing?” She really wanted the garage to be as originally conceived, a demonstration of construction using salvaged materials.

GreenBridge’s partner company, The Riverview Company, stepped up to the plate. Steven was excited to see the construction method and was comfortable working with the Long Way Home Crew. Next hurdle – permitting!

The Permit Process

When we were initially looking at the project, I spoke with the Georgetown building inspector. He was excited to work with us in the permitting process. He is also a ‘green’ builder, and we felt we had a strong advocate in the town. Once we were ready to submit for permit, we found out that he no longer worked there!! The interim inspector ended up being incredibly helpful and supportive of the project, but did request review from the state inspector and additional engineering documentation for the project.  Once we’d submitted proper engineering documentation and agreed to have the rammed earth in the tires tested for compaction throughout the construction process, the permit was approved. We obtained structural reports from EarthShip verifying the structural integrity of the rammed-earth tire walls, and we engaged McPhail and Associates to provide compaction testing.

With our soils engineer at the ready, contractor in place, and plane tickets purchased for the Long Way Home crew, we were ready for construction. Stay tuned to our next blog on construction of the Garbage Garage!

Juli MacDonald, GreenBridge Architects

978.518.2811

About these ads

7 Responses to “Tires, Cans and Bottles, Oh My! Part 2”

  1. Timothy Lee Says:

    looks fantastic Julie – kudos!

  2. gary Says:

    juli you are so darn smart.

  3. Elizabeth Says:

    Where is this lovely structure?

  4. greenbridge Says:

    Hi Elizabeth, It’s in Georgetown.

  5. greenbridge Says:

    All except for when it comes to your birthday Gary. :)


  6. [...] Blogging about the Garbage Garage has connected us with amazing eco-enthusiasts around the world. Thank you for all the interest and comments.  This blog (the final on this project) will focus on the garage’s construction, the best part! See previous posts for information on Project Genesis and Design, Permitting and Preparation for Construction. [...]


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

%d bloggers like this: